Recommended use
Designed for interior works, can be applied on natural stone (tuff), concrete, cement-sand, bricks, concrete blocks and drywall surfaces.
Surface preparation
Prior to application remove dirt, dust, oil, paint, etc. from the surface.
It is recommended to treat the surface with “SHEN” beton contact before the works.
The plaster can be applied after 4-5 hours.
Making the mixture
Pour 18.2-19.6l of water per 35kg of dry mixture into a clean container .
Gradually add dry mixture and stir with a mixer to obtain paste-like mass without lumps.
Application
Apply the mixture with a stainless metallic putty knife or spatula on the surface.
It is recommended to work at air temperatures not lower than +10°C and relative humidity of not more than 75%.
When the work is over or suspended, carefully wash the tools.
Dispose of the paper bags and mixture leftovers as prescribed by local legislation.
For fast plaster drying expose to air and moderate ventilation.